STEP 02 VERIFY
THANK YOU!
Thank you for choosing IncentiFind, The go-to database for green building incentives. We are pleased to connect your Commercial (Multi-Family) project to incentives.
Project Name: Sample VERIFY Report
Project ID: ICFP-0001337
Name: Jane Doe
Email: example@incentifind.com
Address: 123 Main Street, Houston, Texas 77055 (Harris County)
Asset Type: Commercial (Multi-Family) - Existing Building
Project Size: 10000-25000 SF
Construction Start Date: 11/5/2022
Construction End Date: 11/5/2022
Utility Provider(s):Green Technologies: Renewables (Solar), Energy Efficiency Indoor (Lighting, HVAC, Window Films), Energy Efficiency Outdoor (Exterior Lighting), Water Conservation Indoor (Faucets, Toilets), Water Conservation Outdoor (Irrigation, Rain Water Harvesting, Landscaping), Recycling (Incentive Programs for Recycling), Resilience (Generators, Hurricane Proofing, Flood Proofing, Fire Proofing), Other (Electric Vehicle Charging Stations, Affordable Housing, Infill Development, Equity or Equality Related, Materials or Products, Program [LEED, EnergyStar, GreenGlobes, etc.])
Website Survey Completed: July 10, 2019
Survey Submission : 07/10/2019 July 10, 2019
APPLY Services Deadline : 08/13/2019 August 13, 2019
APPLY Services must be authorized by 08/13/2019 Deadline to Authorize APPLY ServicesPre-approval Deadline : 09/12/2019 September 12, 2019
Pre-approval must be completed by 09/12/2019
Pre-approval must be completed by 09/12/2019Construction Start Date : 11/11/2019 November 11, 2019
Construction begins 11/11/2019 Construction Start DateProgram Close : 12/31/2023 December 31, 2023
Application deadline for the following incentive(s):
Application deadline for the following incentive(s): - [Entergy Corporation - 2023 Texas Commercial Solutions Program (New Construction) (#4)](#2023%20Texas%20Commercial%20Solutions%20Program%20(New%20Construction))Present Day : 11/21/2024 November 21, 2024
Program Close : 12/31/2024 December 31, 2024
Application deadline for the following incentive(s):
Application deadline for the following incentive(s): - [Gexa Energy - 2024 Energy Solutions LED Offer (Existing Buildings) (#5)](#2024%20Energy%20Solutions%20LED%20Offer%20(Existing%20Buildings))Disclaimer
The below list of incentives does not guarantee your project’s eligibility or award. Please review the below list of incentives with IncentiFind to determine which incentives you want to APPLY to. We have indicated the incentives we can help you apply to in the "APPLY Services" column as well as the fee associated with the incentive's application process.
Level of Government | Incentive |
Rebate*
|
Tax |
Grant |
Other*
|
EE* |
WC* |
Renewable |
Other |
|||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Utility |
1 | Brilliant Energy - Energy Efficiency (Existing Buildings) - NONE | ||||||||||
Utility |
2 | CenterPoint Energy - 2024 CoolSaver A/C Tune-up (Existing Buildings) | ||||||||||
Utility |
3 | CenterPoint Energy - 2024 Multi-Family Direct Install Program WC (Existing Buildings) | ||||||||||
Utility |
4 | Entergy Corporation - 2023 Texas Commercial Solutions Program (New Construction) | ||||||||||
Utility |
5 | Gexa Energy - 2024 Energy Solutions LED Offer (Existing Buildings) | ||||||||||
Utility |
6 | Texas Gas Service - 2024 Commercial Direct Install Program (Existing Buildings) | ||||||||||
Utility |
7 | TXU Energy - 2024 TXU GreenBack (Existing Buildings) | ||||||||||
Federal |
8 | U.S. Internal Revenue Service (IRS) - 2024 MACRS Cost Segregation Engineered Study and Bonus Depreciation (Existing Buildings) |
Organization - Incentive Name | Eligible Scope | Estimated Funds | Estimated Time | Next Steps to Capture | APPLY Services | |
---|---|---|---|---|---|---|
1. Brilliant Energy
|
No incentive programs are available at this time for the following green measures: Appliances, Compressed Air, Controls, Custom, HVAC, Lighting, Motors Pumps & Drives, Natural Gas, Refrigeration, Thermostats, Water Heating. |
Minimum Funds: No incentive programs are available at this time. Maximum Funds: No incentive programs are available at this time. |
Application period 1/1/2022 - 12/31/2019 1. Applications are currently closed. 2. Preferred Vendor/Contractor required: No preferred vendor/contractor 3. Pre-Approval Required: No 4. Pre-Inspection Required: No 5. Post-Audit Required: No 6. Average time from Application to Approval: No incentive programs are available at this time. 7. After approval, funds typically received: No incentive programs are available at this time. |
No incentive programs are available at this time. |
None |
|
2. CenterPoint Energy
|
Eligibility
Customer Eligibility
The following are not eligible for the program:
Terms and conditions apply. |
Minimum Funds: Receive your FREE CoolSaver A/C tune-up Maximum Funds: Receive your FREE CoolSaver A/C tune-up |
Application period 1/1/2024 - 12/31/2024 1. Application period is open 2. Preferred Vendor/Contractor required: Program-qualified Technician 3. Pre-Approval Required: No 4. Pre-Inspection Required: No 5. Post-Audit Required: No 6. Average time from Application to Approval: Participating A/C contractors will contact you to schedule the service. 7. After approval, funds typically received: No financial incentive offered. |
NOTE: Make sure you are in the Centerpoint Energy (TDU) service territory.
|
APPLY Services are not offered for this incentive. The owner/installer must do the application. |
|
3. CenterPoint Energy
Contact Information Rodney Henderson Jr. CenterPoint Energy Rodney.Henderson@centerpointenergy.com713 207 4211 |
Eligible Project Sponsors typically include:
Multifamily Units
Energy Savings Projects Outside Program Guidelines See Program Manual |
Minimum Funds: The Multi-Family Direct Install Program provides access to water conservation updates at no cost to the developer, property owner or tenants Maximum Funds: The Multi-Family Direct Install Program provides access to water conservation updates at no cost to the developer, property owner or tenants |
Application period 1/1/2024 - 12/31/2024 1. Application period is open 2. Preferred Vendor/Contractor required: CenterPoint's contractor will assist through the process 3. Pre-Approval Required: No 4. Pre-Inspection Required: No 5. Post-Audit Required: No 6. Average time from Application to Approval: No application necessary. 7. After approval, funds typically received: No financial incentive offered. |
NOTE: Make sure you are in the CenterPoint Energy service territory.
|
There is no application associated with this incentive program. |
|
4. Entergy Corporation
Contact Information Mark Delavan, Program Manager Entergy Corporation entergytx@clearesult.com281 297 2214 |
Eligibility
Eligible Measures
|
Minimum Funds: Based on the measures implemented Maximum Funds: Incentive Rates
The maximum funding a customer can receive in one calendar year (which could be multiple projects or one project) is $248,000. |
Application period 1/1/2023 - 12/31/2023 1. Application period is open 2. Preferred Vendor/Contractor required: No preferred vendor/contractor 3. Pre-Approval Required: Yes 4. Pre-Inspection Required: Yes 5. Post-Audit Required: Yes 6. Average time from Application to Approval: Assumes the project timeline. Varies depending on scope of the project. 7. After approval, funds typically received: Payment typically received within 4-6 weeks. |
Note: Make sure you are in the Entergy Solutions (Deregulated Utility) service territory.
|
Don't have time to fill out paperwork? Let our APPLY Services Team do it for you! Once you provide access to appropriate documentation, your assigned APPLY Services Team Member will work with the rebate administrator to maximize the cash rebates your project is approved for. IncentiFind assesses a fee of 30% on successfully acquired rebates. We only get paid if you get paid. There's no hourly rate, no deposit, and we're structured to accompany your project through the inevitable changes. The sooner we start, the more likely we can capture rebates on your behalf. Funding runs out and deadlines pass, so simply click "Help Me Apply" and follow the prompts to authorize your project for our APPLY Services. |
|
5. Gexa Energy
|
Customers get up to 10% of installed LED Drivers. |
Minimum Funds: None Maximum Funds: $5,000 maximum value |
Application period 1/1/2024 - 12/31/2024 1. Application period is closed (Funding depleted. TBD if program will re-activate) 2. Preferred Vendor/Contractor required: DECO Lighting 3. Pre-Approval Required: Yes 4. Pre-Inspection Required: NEEDS UPDATE 5. Post-Audit Required: Yes 6. Average time from Application to Approval: team will be there within 5 business days of your request to measure and verify. You'll get their report within 5 business days after that. 7. After approval, funds typically received: 90 days |
Note: Make sure you are in the Gexa Energy (Retail Energy Provider) service territory.
|
Don't have time to fill out paperwork? Let our APPLY Services Team do it for you! Once you provide access to appropriate documentation, your assigned APPLY Services Team Member will work with the rebate administrator to maximize the cash rebates your project is approved for. IncentiFind assesses a fee of 30% on successfully acquired rebates. We only get paid if you get paid. There's no hourly rate, no deposit, and we're structured to accompany your project through the inevitable changes. The sooner we start, the more likely we can capture rebates on your behalf. Funding runs out and deadlines pass, so simply click "Help Me Apply" and follow the prompts to authorize your project for our APPLY Services. |
|
6. Texas Gas Service
|
Commercial Direct Install Program offer installation of energy- and water-saving upgrades at no cost to you to help you save money and energy. Eligible Equipment
|
Minimum Funds: Free installation of:
Maximum Funds: Free installation of:
|
Application period 1/1/2024 - 12/31/2024 1. Application period is open 2. Preferred Vendor/Contractor required: No preferred vendor/contractor 3. Pre-Approval Required: No 4. Pre-Inspection Required: No 5. Post-Audit Required: No 6. Average time from Application to Approval: No application necessary. 7. After approval, funds typically received: Varies depending on your project's (building's) performance after improvements / upgrades are completed and measured. Funds will reflect your project's (building's) performance. |
|
No application is required for this incentive. |
|
7. TXU Energy
Contact Information Tamica James TXU (Deregulated Utility Company) tamica.james@txu.com800-368-1728 |
Get rebates for making energy-efficiency improvements to your facilities that yield long-term savings. TXU GreenBackSM dollars can help you fund a new project or help pay for existing projects, like changing to LED lighting. |
Minimum Funds: Varies by Project. Maximum Funds: Varies by Project. |
Application period 1/1/2024 - 12/31/2024 1. Application period is open 2. Preferred Vendor/Contractor required: No preferred vendor/contractor 3. Pre-Approval Required: No 4. Pre-Inspection Required: No 5. Post-Audit Required: No 6. Average time from Application to Approval: Varies by project. Please work with a program team member to ensure a streamlined process. 7. After approval, funds typically received: Please allow up to 90 days to receive incentive payment. |
Note: Make sure you are in the TXU (Retail Energy Provider) service territory.
|
No application is required for this incentive. |